Jul. 3, 2013
New propane valve and regulator
Jul. 6, 2013
Rebuilt seawater washdown pump
Jul. 28, 2013
Replaced engine and generator exhaust hoses
Aug. 29, 2013
Removed 220v converter, removed batteries, rewired with new buss bars
Aug. 31, 2013
Installed bracket for trawler lamp, replaced cockpit drain hoses,
Sept. 2, 2013
Installed spice racks and paper towel holder, fitted coffee pot into fiddle rail, polished ports
Sept. 8, 2013
Installed new bracket for refrigeration compressor on engine, ran engine
Sept. 7, 2013
Removed head, hoses, holding tank
Sept. 12, 2013
Finished attaching generator exhaust hose, made holding tank pattern
Sept. 14, 2013
New fresh water pump, New galley faucet, New salt water sprayer in galley
Sept 15, 2013
New pressure tank, Rebuilt bilge pump, Cleaned bilges
Oct. 3, 2013
New LED galley lights
Nov. 10, 2013
Installed new Dickinson stove
Feb. 24, 2014
Refurbished tool locker
Mar. 20, 2014
Started cockpit renovation: steel railings, bridge deck, new teak, new stern anchor, new steering idler, fresh varnish
Apr. 19, 2014
Bimini finished
June 3, 2014
New windlass
June 3, 2014
Removed mast
June 11, 2014
New companionway doors
July 26, 2014
Painted mast
July 29, 2014
Hauled out: bottom paint, paint touch-up, wax, zincs
Aug. 9, 2014
Stepped mast
Aug. 19, 2014
New nav station panel
Aug. 28, 2014
Rig finished
Sept. 3, 2014
New Sails
Sept. 15, 2014
Made travasaks
Sept. 19, 2014
Tested dinghy and outboard
Oct. 3, 2014
Made mainsail cover
Dec. 28, 2014
All new batteries
Mar. 2, 2015
New capacitor on refrigeration unit
No comments:
Post a Comment